Lancaster Mobley has provided transportation engineering services and strategic planning for Clackamas Community College beginning in 2015 through multiple bond construction cycles.
Oregon City Transit Center
LeBrun Design2023-09-05T20:36:04+00:00Lancaster Mobley prepared for TriMet a comparative transportation analysis of two alternatives for the reconfiguration of the Oregon City Transit Center.
Dollar General in Sisters, OR
LeBrun Design2023-08-17T16:23:44+00:00Lancaster Mobley performed the transportation engineering and planning studies for a proposed 9,100 sq. ft. Dollar General in Sisters, Oregon, on an undeveloped site.
Greenburg Road Apartments
LeBrun Design2021-07-22T19:26:18+00:00Lancaster Mobley performed the Traffic Impact Study for a 144-unit affordable housing in Tigard’s Washington Square District, a rail/retail corridor.
Tualatin Industrial Park
LeBrun Design2021-07-13T20:48:49+00:00Lancaster Mobley completed the Transportation Impact Study for the construction of three warehouse buildings, totaling approximately 245,018 square feet, while removing an existing single-family house.
Lombard Mixed-Use Building
LeBrun Design2021-07-13T20:33:17+00:00Lancaster Mobley performed the traffic study for the redevelopment of five properties in Beaverton, Oregon. The mixed-use building will include the construction of a five-story building consisting of 173 residential apartment units (Verso Apartments) [...]
Ogden Middle School
LeBrun Design2020-12-15T18:00:20+00:00Lancaster Mobley reviewed the proposed design of a school crosswalk including the logistics and placement of the subsequent school speed zone signs near Ogden Middle School in Oregon City, Oregon.
Parklane Park
LeBrun Design2020-12-14T23:19:28+00:00Parklane Park in Southeast Portland is being redeveloped and expanded from 5 acres to 25 acres with an expected opening in late fall of 2022.
Delta Park Soccer Fields
LeBrun Design2019-11-13T18:08:05+00:00Lancaster Mobley prepared a traffic impact study to guide Portland Parks and Recreation through a conditional-use process for soccer field renovations, including installation of turf fields and lighting. Analysis included trip generation estimates as [...]
Portland International Raceway
LeBrun Design2019-11-13T18:08:23+00:00Lancaster Mobley worked closely with Portland Parks and Recreation and the consultant team to update the Portland International Raceway master plan. This included coordination with the City of Portland and the Oregon Department of [...]
Portland Community College Rock Creek
Lancaster2019-11-13T18:09:12+00:00Lancaster Mobley has provided transportation planning and engineering services for PCC throughout their district but has had particularly detailed involvement at the Rock Creek Campus. Our work began in 2009 with major building projects [...]
18th/19th and Burnside
Lancaster2019-11-27T17:45:07+00:00As part of the West Burnside Multimodal Project, Lancaster Mobley provided infrastructure design services for traffic signal modification and replacement at the intersections of 18th Avenue, 19th Avenue, and Burnside. The intersection will soon [...]