Lancaster Mobley assisted our returning client with additional transportation engineering for the Commons on the Tualatin apartment complex in Tualatin, Oregon.
Clackamas Community College Master Plan
LeBrun Design2023-09-05T20:49:00+00:00Lancaster Mobley has provided transportation engineering services and strategic planning for Clackamas Community College beginning in 2015 through multiple bond construction cycles.
Oregon City Transit Center
LeBrun Design2023-09-05T20:36:04+00:00Lancaster Mobley prepared for TriMet a comparative transportation analysis of two alternatives for the reconfiguration of the Oregon City Transit Center.
PSU Gateway Center
LeBrun Design2023-11-08T18:23:38+00:00Lancaster Mobley is on the Lever Architecture led team for the PSU Gateway project located at 1914 SW Park Avenue. Our role includes loading analysis, vehicular access, photometric assessment, traffic signal and street lighting design.
Dollar General in Sisters, OR
LeBrun Design2023-08-17T16:23:44+00:00Lancaster Mobley performed the transportation engineering and planning studies for a proposed 9,100 sq. ft. Dollar General in Sisters, Oregon, on an undeveloped site.
Hollywood Transit Center
LeBrun Design2021-10-04T18:02:08+00:00Lancaster Mobley worked with Trimet on their efforts to make the Hollywood Transit Center in Portland, Oregon a hub for transit and community.
Greenburg Road Apartments
LeBrun Design2021-07-22T19:26:18+00:00Lancaster Mobley performed the Traffic Impact Study for a 144-unit affordable housing in Tigard’s Washington Square District, a rail/retail corridor.
Hillside Master Plan
LeBrun Design2021-11-18T20:07:59+00:00Lancaster Mobley worked on the Hillside Master Plan for Housing Opportunity which is a grant-funded housing community in Milwaukie/Clackamas County.
Tualatin Industrial Park
LeBrun Design2021-07-13T20:48:49+00:00Lancaster Mobley completed the Transportation Impact Study for the construction of three warehouse buildings, totaling approximately 245,018 square feet, while removing an existing single-family house.
Lombard Mixed-Use Building
LeBrun Design2021-07-13T20:33:17+00:00Lancaster Mobley performed the traffic study for the redevelopment of five properties in Beaverton, Oregon. The mixed-use building will include the construction of a five-story building consisting of 173 residential apartment units (Verso Apartments) [...]
Ogden Middle School
LeBrun Design2020-12-15T18:00:20+00:00Lancaster Mobley reviewed the proposed design of a school crosswalk including the logistics and placement of the subsequent school speed zone signs near Ogden Middle School in Oregon City, Oregon.
Parklane Park
LeBrun Design2020-12-14T23:19:28+00:00Parklane Park in Southeast Portland is being redeveloped and expanded from 5 acres to 25 acres with an expected opening in late fall of 2022.











